Difference between revisions of "Hall A He3 Polarized Target"
From Hall A Wiki
(→Target Lab) |
(→System Description) |
||
Line 4: | Line 4: | ||
=== System Description === | === System Description === | ||
*[http://hallaweb.jlab.org/equipment/targets/polhe3/polhe3_tgt.html Basic He3 Target Information] | *[http://hallaweb.jlab.org/equipment/targets/polhe3/polhe3_tgt.html Basic He3 Target Information] | ||
− | *[http://hallaweb.jlab.org/physics/experiments/he3 | + | *[http://hallaweb.jlab.org/physics/experiments/he3 Old Static Page] |
*[http://tun1.jlab.org:3389/PolHe3/ He3 Target Logbook] | *[http://tun1.jlab.org:3389/PolHe3/ He3 Target Logbook] | ||
*[[Target Ladder diagram]] | *[[Target Ladder diagram]] | ||
*[[Complete System Diagram]] | *[[Complete System Diagram]] | ||
− | *[[Target preliminary survey of ladder before change ( scheduled to be done on | + | *[[Target preliminary survey of ladder before change (scheduled to be done on Monday November 11th 2008) ]] |
=== Manuals === | === Manuals === |
Revision as of 15:21, 1 November 2011
Target Lab
System Description
- Basic He3 Target Information
- Old Static Page
- He3 Target Logbook
- Target Ladder diagram
- Complete System Diagram
- Target preliminary survey of ladder before change (scheduled to be done on Monday November 11th 2008)
Manuals
- Special Procedure For Moving Target
- Procedure for Longitudinal 3He Elastic Measurement
- Holding Field Control
- Target Slow Control
- Online Spin Flip
- NMR Measurement
- EPR Measurement
- Laser Control
- Oven Control
- Strip Charts
Check Lists
- eed Target Operator Check List
- Target Operator Check List
- d2n Target Operator Check List
- Hall Access Check List
- Target Enclosure Work Checklist