Difference between revisions of "Hall A He3 Polarized Target"
From Hall A Wiki
(→Expert Information) |
(→Expert Information) |
||
Line 39: | Line 39: | ||
*[[ToDo List as Oct 2, 2008|ToDo List]] | *[[ToDo List as Oct 2, 2008|ToDo List]] | ||
*[[Target NIM Paper]] | *[[Target NIM Paper]] | ||
+ | *[[http://dl.dropbox.com/u/3202526/2009.3.30.pptx]] |
Revision as of 17:33, 1 April 2010
Target Lab
System Description
- Basic He3 Target Information
- He3 Target Logbook
- Target Ladder diagram
- Complete System Diagram
- Target preliminary survey of ladder before change ( scheduled to be done on monday November 11th 2008)
Manuals
- Special Procedure For Moving Target
- Procedure for Longitudinal 3He Elastic Measurement
- Holding Field Control
- Target Slow Control
- Online Spin Flip
- NMR Measurement
- EPR Measurement
- Laser Control
- Oven Control
- Strip Charts
Check Lists
- eed Target Operator Check List
- Target Operator Check List
- d2n Target Operator Check List
- Hall Access Check List
- Target Enclosure Work Checklist