Difference between revisions of "Hall A He3 Polarized Target"
From Hall A Wiki
(→Expert Information) |
m (→System Description) |
||
Line 3: | Line 3: | ||
=== System Description === | === System Description === | ||
*[http://hallaweb.jlab.org/equipment/targets/polhe3/polhe3_tgt.html Basic He3 Target Information] | *[http://hallaweb.jlab.org/equipment/targets/polhe3/polhe3_tgt.html Basic He3 Target Information] | ||
+ | *[http://hallaweb.jlab.org/physics/experiments/he3 old static page] | ||
*[http://tun1.jlab.org:3389/PolHe3/ He3 Target Logbook] | *[http://tun1.jlab.org:3389/PolHe3/ He3 Target Logbook] | ||
*[[Target Ladder diagram]] | *[[Target Ladder diagram]] |
Revision as of 18:55, 7 December 2010
Target Lab
System Description
- Basic He3 Target Information
- old static page
- He3 Target Logbook
- Target Ladder diagram
- Complete System Diagram
- Target preliminary survey of ladder before change ( scheduled to be done on monday November 11th 2008)
Manuals
- Special Procedure For Moving Target
- Procedure for Longitudinal 3He Elastic Measurement
- Holding Field Control
- Target Slow Control
- Online Spin Flip
- NMR Measurement
- EPR Measurement
- Laser Control
- Oven Control
- Strip Charts
Check Lists
- eed Target Operator Check List
- Target Operator Check List
- d2n Target Operator Check List
- Hall Access Check List
- Target Enclosure Work Checklist