Difference between revisions of "Compton"
m (→Tungsten "Jaws" Controls) |
(Updated beam centering procedure. -LT) |
||
Line 73: | Line 73: | ||
Electronics, etc. | Electronics, etc. | ||
− | === Centering the Beam === | + | === Centering the Beam on the Laser === |
− | + | Open jaws all the way: | |
− | + | aperture = 43.69 mm | |
+ | y center = -3.28 mm | ||
+ | |||
+ | |||
+ | Use the strip tool for this to watch Compton rates (ComptonCentralRate, ComptonCentralRateHigh) as you change the Y beam positioning. This position will change daily, so may need frequent adjustment. | ||
+ | |||
+ | The laser spot is 0.9 mm | ||
=== Photon Detector Table === | === Photon Detector Table === |
Revision as of 15:34, 4 November 2016
Contents
Spring 2016 Compton
The Compton polarimeter is used to (non-invasively) monitor polarization of the incoming electron beam. It has three major components: an optics table with a laser that can lock to a Fabry-Perot cavity, an electron detector, and a photon detector to count scattered electrons and photons, respectively.
Last edit: LThorne 02:08, 24 February 2016 (UTC)
Shift Workers' Operation Guide
Instructions for shift workers to run Compton.
- Pre-check:
- HV on/off? -> Compton#High Voltage Controls
- [Experts only]: Correct parameters for run in integratingDAQ.flags and compton.params?
Start a Compton run every two hours.
The Compton DAQ is located in the back room in the Counting House. All commands are done from compton@compton.
If CODA is not already running:
- Kill CODA first, then start it up again:
$ kcoda $ startcoda
- A few new Terminal windows and a GUI pop up.
- Let "top" refer to the bar with named menu options near the top of the GUI (ex: Platform, Sessions, etc). Let "bottom" refer to the bar below "top" that contains a line of buttons (hover over them to reveal their labels; starting with "Configuration" on the left).
- In top, select: Platform > Connect
- In bottom, click on "Configuration" button.
- If configuration listed in the "Run Parameters" box is not FADC_prod: in top, select Configurations > Cool and change it to FADC_Prod.
- In bottom, click on "Download" button
- In bottom, click on "Prestart" button
- When ready to start run, click "Start" button. Typical run duration: 2 hours. Type in any Start Of Run comments in the box.
- When ready to stop run, click "End" button. Type in any End Of Run comments in the box.
Compton Experts' Operation Guide
Run Compton analysis:
In compton@compton:
$ cd /home/compton/CompMon/
Run analysis software:
$ ./compmon <run number, no brackets>
Open ROOT:
$ root -l /data/cmuwork/rootfiles/Fall2016/compmon_<run number, no brackets>.root
Run desired C script located in CompMon directory.
Some useful analysis scripts:
- /home/compton/lthorne/CompMon/plotAsymSpectrum.C: Quick and dirty view of asymmetry histograms, cavity and BCM limits.
- /home/compton/lthorne/CompMon/buildQuartets.C and buildQuartetsPlot.C: For constructing multi-run asymmetry plots.
- /home/compton/lthorne/CompMon/BCMCal/calibration<runNumber>,C: BCM calibration scripts for specific runs.
Hardware
Electronics, etc.
Centering the Beam on the Laser
Open jaws all the way:
aperture = 43.69 mm y center = -3.28 mm
Use the strip tool for this to watch Compton rates (ComptonCentralRate, ComptonCentralRateHigh) as you change the Y beam positioning. This position will change daily, so may need frequent adjustment.
The laser spot is 0.9 mm
Photon Detector Table
For controls, troubleshooting: Compton Photon Detector
Tungsten Collimator Controls ("Jaws")
EXPERTS ONLY jaw controls: [1]
Live Compton camera: [2]
High Voltage Controls
Know the HV channel and navigate to the GUI: HV Control GUI
Laser System
Make sure laser flipping is on
Accessing the laser hutch in the hall
Laser and Locking troubleshooting
Software & Data Analysis
Relevant files, scripts, etc.
Helicity controls
From within NewTools controls (see first few steps in Compton Photon Detector Compton GUI section):
- On far right of JTabs menu, there are "master" controls. Find and click on Tools Screen.
- Go to the helicity controls. (The default is delayed, so be careful of this.)
Current Scripts
As a brief check, run plotAsymSpectrum.C.
Compton Meetings
See last list entry for most recent meeting.
- Friday, December 7, 2012 11am EST - Compton
- Monday, January 14, 2013 1pm EST - Compton
- Tuesday, February 12, 2013 3pm EST - Compton
- Thursday, March 28, 2013 1pm EST - Compton
- Wednesday, May 1, 2013 2pm EST - Compton
- Thursday, September 26, 2013 2pm EST - Compton
- Thursday, November 14, 2013 2pm EST - Compton
- Tuesday, December 10, 2013 11am EST - Compton
- Thursday, February 27, 2014 2:30pm EST - Compton
- Friday, April 4, 2014 2:00pm EDT - Compton
- Thursday, May 21, 2015, 11:00am EDT - Compton
- Thursday, June 4, 2015, 11:00am EDT - Compton
- Thursday, July 2, 2015, 11:00am EDT - Compton
- Thursday, July 23, 2015, 11:00am EDT - Compton
- Thursday, August 6, 2015, 11:00am EDT - Compton
- Thursday, September 3, 2015, 11:00am EDT - Compton
- Thursday, September 17, 2015, 11:00am EDT - Compton
- Monday, September 28, 2015, 11:00am EDT - Compton
- Monday, October 19, 2015, 11:00am EDT - Compton
- Monday, November 9, 2015, 11:00am EST - Compton
- Monday, November 23, 2015, 11:00am EST - Compton
- Monday, December 7, 2015, 11:00am EST - Compton
- Monday, January 11, 2016, 11:00am EST - Compton
- Thursday, January 28, 2016, 10:00am EST - Compton
- Thursday, February 11, 2016, 10:00am EST - Compton
- Thursday, February 25, 2016, 10:00am EST - Compton
- Thursday, March 10, 2016, 10:00am EST - Compton
- Thursday, March 31, 2016, 10:00am EDT - Compton
- Thursday, April 21, 2016, 10:00am EDT - Compton
- Thursday, May 5, 2016, 10:00am EDT - Compton
- Thursday, May 26, 2016, 10:00am EDT - Compton
- Thursday, June 9, 2016, 10:00am EDT - Compton
- Thursday, June 30, 2016, 10:00am EDT - Compton
- Thursday, July 28, 2016, 10:00am EDT - Compton
- Thursday, August 11, 2016, 10:00am EDT - Compton
- Thursday, September 1, 2016, 10:00am EDT - Compton
- Thursday, September 15, 2016, 10:00am EDT - Compton
- Thursday, September 29, 2016, 10:00am EDT - Compton
- Thursday, October 13, 2016, 10:00am EDT - Compton
- Friday, October 21, 2016, 10:30 am - 3:30 pm EDT - EDET Working Group Meeting
- Monday, October 24, 2016, 11:00am EDT - Compton
- Monday, November 7, 2016, 11:00am EST - Compton
Current Compton Experts
Expert | Phone |
---|---|
Dave Gaskell | x6092 |
Alexandre Camsonne | x5064 |
Ciprian Gal | x6235 |
Juan Carlos Cornejo (Photon Detector) | x5282 |
Expert Information
For expert monitoring and troubleshooting information please visit Compton Expert Information.
Old Compton page (pre-Spring 2016)
Last edit on 2016 11 04, by Lthorne