Compton
Contents
Spring 2016 Compton
The Compton polarimeter is used to (non-invasively) monitor polarization of the incoming electron beam. It has three major components: an optics table with a laser that can lock to a Fabry-Perot cavity, an electron detector, and a photon detector to count scattered electrons and photons, respectively.
Last edit: LThorne 02:08, 24 February 2016 (UTC)
Shift Workers' Operation Guide
Start a Compton run every two hours.
The Compton DAQ is located in the back room in the Counting House. All commands are done from compton@compton.
If CODA is not already running:
- Kill CODA first, then start it up again:
$ kcoda $ startcoda
- A few new Terminal windows and a GUI pop up.
- Let "top" refer to the bar with named menu options near the top of the GUI (ex: Platform, Sessions, etc). Let "bottom" refer to the bar below "top" that contains a line of buttons (hover over them to reveal their labels; starting with "Configuration" on the left).
- In top, select: Platform > Connect
- In bottom, click on "Configuration" button.
- If configuration listed in the "Run Parameters" box is not FADC_prod: in top, select Configurations > Cool and change it to FADC_Prod.
- In bottom, click on "Download" button
- In bottom, click on "Prestart" button
- When ready to start run, click "Start" button. Typical run duration: 2 hours. Type in any Start Of Run comments in the box. Click "OK" (even if you left comments blank!).
- When ready to stop run, click "End" button. Type in any End Of Run comments in the box. Click "OK" (even if you left comments blank!).
Compton Experts' Operation Guide
Pre-check:
- HV on/off? -> Compton#High Voltage Controls
- [Experts only]: Correct parameters for run in integratingDAQ.flags and compton.params
Run Compton analysis:
In compton@compton:
$ cd /home/compton/online/CompMon
Run analysis software:
$ ./compmon <run number, no brackets>
Open ROOT:
$ root -l /data/cmuwork/rootfiles/Fall2016/compmon_<run number, no brackets>.root
Run desired C script located in CompMon directory.
Some useful analysis scripts:
- /home/compton/lthorne/CompMon/plotAsymSpectrum.C: Quick and dirty view of asymmetry histograms, cavity and BCM limits.
- /home/compton/lthorne/CompMon/buildQuartets.C and buildQuartetsPlot.C: For constructing multi-run asymmetry plots.
- Run instructions are given in the comments at the beginning fo the file.
- /home/compton/lthorne/CompMon/BCMCal/calibration<runNumber>,C: BCM calibration scripts for specific runs.
Link to list of good Compton runs:
List of runs with comments, so know which ones were not junk.
Juan Carlos Google Docs: put link here when secure
Taking an LED run:
- Find parameter file GUI:
$ cd /home/compton/franklin/ $ ComptonConfig
- Click "Pulser On, Pulser Trigger" on parameter file. Click "Apply", then "Done" to close GUI.
- Go to CODA. Start a new run to apply the settings. (This does not need to be a long run. You may end it immediately.)
- Start your LED run.
- When you go back to normal Compton runs: don't forget to turn the pulser off and do a short run to update the parameter file settings!
Hardware
Electronics, etc.
Special 5-pass instructions
(Update this section)
- Insert capacitor on back of MiniMegan control box. It's just a BNC terminator with a capacitor on the end:
- Add extra lead sych shield #6 in front of photon detector table. Remember to update the wiki if this occurs.
- Make changes to .flags file
Centering the Beam on the Laser
Open jaws all the way:
aperture = 43.69 mm y center = -3.28 mm
Tell Dave to make the laser stop flipping. Tell MCC we're centering now.
Use the strip tool for this to watch Compton rates (ComptonCentralRate, ComptonCentralRateHigh) as you change the Y beam positioning. This position will change daily, so may need frequent adjustment.
The laser spot is 0.9 mm, so use small incremental steps. Suggested incremental step change: 0.5mm at a time. No need to map out everything; stop when you think you've located the laser beam.
Photon Detector Table
For controls, troubleshooting: Compton Photon Detector
Home position of photon detector table: (Dave insert, please)
Collimator Systems
- Remote-controlled tungsten collimator system ("Jaws"):
- Lead cylindrical collimator:
- Length approx 10 cm with two openings: 1 and 2 cm diameters
- Synchrotron shielding:
- 7 individual thin shields that are numbered, with thickness denoted in X.XX mm +/- 0.01mm:
- #1: 1.56
- #2: 1.61
- #3: 1.61
- #4: 1.62
- #5: 1.64 <--- currently in (inserted 2016-10-27)
- #6: 1.64
- #7: 1.67
- 7 individual thin shields that are numbered, with thickness denoted in X.XX mm +/- 0.01mm:
High Voltage Controls
Know the HV channel and navigate to the GUI: HV Control GUI
Laser System
Make sure laser flipping is on
Accessing the laser hutch in the hall
Laser and Locking troubleshooting
Software & Data Analysis
Relevant files, scripts, etc.
Helicity controls
From within NewTools controls (see first few steps in Compton Photon Detector Compton GUI section):
- On far right of JTabs menu, there are "master" controls. Find and click on Tools Screen.
- Go to the helicity controls. (The default is delayed, so be careful of this.)
Current Scripts
As a brief check, run plotAsymSpectrum.C.
Compton Meetings
See last list entry for most recent meeting.
- Friday, December 7, 2012 11am EST - Compton
- Monday, January 14, 2013 1pm EST - Compton
- Tuesday, February 12, 2013 3pm EST - Compton
- Thursday, March 28, 2013 1pm EST - Compton
- Wednesday, May 1, 2013 2pm EST - Compton
- Thursday, September 26, 2013 2pm EST - Compton
- Thursday, November 14, 2013 2pm EST - Compton
- Tuesday, December 10, 2013 11am EST - Compton
- Thursday, February 27, 2014 2:30pm EST - Compton
- Friday, April 4, 2014 2:00pm EDT - Compton
- Thursday, May 21, 2015, 11:00am EDT - Compton
- Thursday, June 4, 2015, 11:00am EDT - Compton
- Thursday, July 2, 2015, 11:00am EDT - Compton
- Thursday, July 23, 2015, 11:00am EDT - Compton
- Thursday, August 6, 2015, 11:00am EDT - Compton
- Thursday, September 3, 2015, 11:00am EDT - Compton
- Thursday, September 17, 2015, 11:00am EDT - Compton
- Monday, September 28, 2015, 11:00am EDT - Compton
- Monday, October 19, 2015, 11:00am EDT - Compton
- Monday, November 9, 2015, 11:00am EST - Compton
- Monday, November 23, 2015, 11:00am EST - Compton
- Monday, December 7, 2015, 11:00am EST - Compton
- Monday, January 11, 2016, 11:00am EST - Compton
- Thursday, January 28, 2016, 10:00am EST - Compton
- Thursday, February 11, 2016, 10:00am EST - Compton
- Thursday, February 25, 2016, 10:00am EST - Compton
- Thursday, March 10, 2016, 10:00am EST - Compton
- Thursday, March 31, 2016, 10:00am EDT - Compton
- Thursday, April 21, 2016, 10:00am EDT - Compton
- Thursday, May 5, 2016, 10:00am EDT - Compton
- Thursday, May 26, 2016, 10:00am EDT - Compton
- Thursday, June 9, 2016, 10:00am EDT - Compton
- Thursday, June 30, 2016, 10:00am EDT - Compton
- Thursday, July 28, 2016, 10:00am EDT - Compton
- Thursday, August 11, 2016, 10:00am EDT - Compton
- Thursday, September 1, 2016, 10:00am EDT - Compton
- Thursday, September 15, 2016, 10:00am EDT - Compton
- Thursday, September 29, 2016, 10:00am EDT - Compton
- Thursday, October 13, 2016, 10:00am EDT - Compton
- Friday, October 21, 2016, 10:30 am - 3:30 pm EDT - EDET Working Group Meeting
- Monday, October 24, 2016, 11:00am EDT - Compton
- Monday, November 7, 2016, 11:00am EST - Compton
Current Compton Experts
Expert | Phone |
---|---|
Dave Gaskell | x6092 |
Alexandre Camsonne | x5064 |
Ciprian Gal | x6235 |
Juan Carlos Cornejo (Photon Detector) | x5282 |
Expert Information
For expert monitoring and troubleshooting information please visit Compton Expert Information.
Old Compton page (pre-Spring 2016)
Last edit on 2016 11 08, by Lthorne