385183 05/15/12 18:08 Jixie Moller preliminary result @ 05/15/2012
385182 05/15/12 17:54 Jixie moller: Bleed through polarization
385178 05/15/12 17:19 Jixie Moller HV off
385177 05/15/12 17:19 Jixie Finish moller. Recovering beam for production
385174 05/15/12 15:43 Jixie beam polarization, more statistics
385166 05/15/12 13:55 Jixie beam is back!
385165 05/15/12 13:07 Jixie preliminary beam polarization
385157 05/15/12 10:46 Jixie Start to do moller measurement
383767 05/10/12 21:08 Jixie Change Left P0 to 2.183, 3%
383667 05/10/12 14:55 Jixie Draining LHe from the target nose, Start optics
383577 05/10/12 10:48 Jixie Late Entry: Pengjia is doing harp scan
383561 05/10/12 08:57 Jixie Sieve is in
383482 05/09/12 17:19 Jixie Optics plan for 2.254GeV with 5.01T at 90 degrees target field
383203 05/08/12 11:55 Jixie CH2 optics data of right arm center hole
383202 05/08/12 11:50 Jixie Set right septum to 608.8A,to match left arm
383201 05/08/12 11:47 Jixie Sieve is out
383190 05/08/12 10:52 Jixie, MIN Start optics
383187 05/08/12 10:48 Jixie Cycle both arms, Set both P0=2.251
382205 05/04/12 15:48 Jixie Moller measurement results
382201 05/04/12 14:56 Jixie Finished moller measurement. Recover beam for production
382200 05/04/12 14:53 Jixie Pb at Wien=-60.2
382199 05/04/12 14:51 Jixie Pb @ wien=-60.2
382198 05/04/12 14:50 Jixie spin dance result
382192 05/04/12 13:33 Jixie Pb @ wien=20, changing to FINAL angle -60.2
382191 05/04/12 13:03 Jixie reboot moller coda (old daq)
382190 05/04/12 12:48 Jixie Pb @ wien=-20, moving to Wien=+20
382189 05/04/12 12:17 Jixie Pb with Wien=-70, changing to wien=-20
382188 05/04/12 11:40 Jixie Pb for Wien=-60.85, changing wien to -75
382180 05/04/12 10:12 Jixie Rebooted moller daq crate, mpc problems solved
382179 05/04/12 09:46 Jixie errors on moller polorimeter control
381982 05/03/12 19:00 Jixie Left HRS moved to 1%
381981 05/03/12 18:59 Jixie Septa regulation is enabled
381978 05/03/12 18:50 Jixie, Min, Finish pointing, start delta scan
381971 05/03/12 18:17 Jixie, Chao, Center hole of CH2 data
381965 05/03/12 17:57 Jixie Start pointing, take data with CH2
381964 05/03/12 17:56 Jixie LHe is already drained out
381952 05/03/12 17:08 Jixie, Chao draining LHe, optics started
381526 05/02/12 18:11 Jixie optics plan for 2.254GeV with 5T and 0 deg target field
381525 05/02/12 18:11 Jixie optics plan for 2.254GeV with 5T and 0 deg target field
380923 04/30/12 22:52 jixie is it a binning issue? could u try smaller bin?
380923 04/30/12 22:52 jixie is it a binning issue? could u try smaller bin?
380742 04/30/12 08:57 Jixie Doug's run plan v2
378081 04/23/12 20:58 Jixie Correction: The stat uncertainty for Pb is 0.331%, not 3.31%
378077 04/23/12 20:36 Jixie, Shasa Moller measurement results
378081 04/23/12 20:58 Jixie Correction: The stat uncertainty for Pb is 0.331%, not 3.31%
378076 04/23/12 20:32 jixie Finished Moller, recover beam for production
377999 04/23/12 12:24 Jixie Beam scratch the top part of the beam pipe again, keep BPMB_Y=-5.7 will help
377999 04/23/12 12:24 Jixie Beam scratch the top part of the beam pipe again, keep BPMB_Y=-5.7 will help
377485 04/22/12 12:51 Jixie How to turn on septa voice alarm
377485 04/22/12 12:51 Jixie How to turn on septa voice alarm
376635 04/20/12 16:20 Jixie, Bob, Day shift summary
376629 04/20/12 14:29 Jixie Both arm are set to 0%, P0=1.1571 GeV
376628 04/20/12 14:27 Jixie It takes about 30 minutes to change right dipole from -3.5% to 0%
376626 04/20/12 14:01 Jixie MCC need one more hour to work on I2V converter for the injector
376623 04/20/12 12:22 Jixie MCC is setting up high current for HallC
376621 04/20/12 11:11 Jixie Beam is down for change wien angle
376618 04/20/12 11:10 Jixie Spot figures with tune beam
376588 04/20/12 10:38 Jixie MCC will start change wien angle in 10 minutes
376546 04/20/12 10:04 Jixie slow raster adjusting
376537 04/20/12 09:54 Jixie Slow raster is now 0.7 V
376536 04/20/12 09:54 Jixie beam is now available, start spot++
376529 04/20/12 09:45 Jixie Septa regulation are now available
376517 04/20/12 08:09 Jixie MCC is cycling the FZ magnet
376506 04/19/12 18:41 Jixie optics plan for 1.1GeV with 2.5T at 90 degrees target field
376102 04/18/12 04:55 mhuang/jixie H peak from Gep NH3 run for pointing
375947 04/17/12 18:08 JIxie Cycle left and right Q2 Q3
375946 04/17/12 18:06 mhuang/jixie H peak from NH3 run
375944 04/17/12 17:59 Jixie optics plan for gep at 1.706 GeV
375946 04/17/12 18:06 mhuang/jixie H peak from NH3 run
375530 04/16/12 19:34 Jixie Optics Plan at owl Tuesday
375140 04/16/12 00:32 Jixie Zhang Run 41333 and 41334 looks like dummy target, not NH3, Please check immediately
374576 04/14/12 20:22 Jixie Zhang It was updated with more tosca tables on Friday afternoon, about 3:30 PM.
374576 04/14/12 20:22 Jixie Zhang It was updated with more tosca tables on Friday afternoon, about 3:30 PM.
374097 04/13/12 22:46 Jixie Septum current alarm is on
374061 04/13/12 21:17 Jixie, Chao spot_3 for dilution runs, best beam position for current tuning
374054 04/13/12 21:02 Jixie beam position study
374061 04/13/12 21:17 Jixie, Chao spot_3 for dilution runs, best beam position for current tuning
374005 04/13/12 19:44 jixie Moved beam 2mm to the right
373893 04/13/12 15:33 jixie looks like hiting something, reduce raster if needed
373893 04/13/12 15:33 jixie looks like hiting something, reduce raster if needed
372995 04/12/12 02:39 Jixie Zhang New right septum field map (40-00-16 turns of coils)
372992 04/12/12 02:33 Jixie Zhang New right septum field map (40-00-16 turns of coils)
372790 04/11/12 17:02 Jixie Cycle Q2 and Q3, plan to move to -4% in left HRS and -3.5% in right HRS
372771 04/11/12 15:26 Jixie GetSeptaCurrent Updated for this septum
372771 04/11/12 15:26 Jixie GetSeptaCurrent Updated for this septum
372489 04/10/12 10:50 Jixie Curretn status
372354 04/10/12 00:35 Jixie Run plan for Owl Apr 10
372284 04/09/12 23:07 Jixie How to make vertical correction to target insert
372187 04/09/12 21:12 Jixie Status update
372182 04/09/12 19:59 Jixie reset left septum
372181 04/09/12 19:43 jixie reset left septum power supply
372179 04/09/12 19:29 Jixie Target insert vertical offset for 1.706 GeV, 2.5T, 90deg target field
372146 04/09/12 15:29 Jixie asked to change to controlled acess
372129 04/09/12 14:37 Jixie Sieve is IN
372114 04/09/12 13:44 Jixie current status
372024 04/09/12 09:21 Jixie Hall will be closed at 3PM
372019 04/09/12 09:03 Jixie Hall is in restricted access
371866 04/09/12 00:35 Jixie Start dilution run for 1.940 at 8:00 AM
371864 04/09/12 00:30 Jixie Update to the run plan
371866 04/09/12 00:35 Jixie Start dilution run for 1.940 at 8:00 AM
371863 04/09/12 00:25 Jixie Run plan for OWL shift Apr 9th
371864 04/09/12 00:30 Jixie Update to the run plan
371682 04/08/12 14:12 Jixie TO 3rd person: Take less than 7M events each run for HRS
371650 04/08/12 12:39 Jixie Beam current increased to 60nA
371637 04/08/12 12:14 Jixie Updated spot3halog script, target cell information added
371636 04/08/12 12:12 Jixie debugging the spot3halog script
371637 04/08/12 12:14 Jixie Updated spot3halog script, target cell information added
371423 04/08/12 00:35 Jixie Why the right septum field changed at 3 hours ago?
371008 04/07/12 02:36 Jixie This should be C12 dilution run, the comment is not correct
370905 04/06/12 20:46 Jixie BPMA X position drift
370896 04/06/12 20:30 Jixie start of run for 3rd arm are missing
370905 04/06/12 20:46 Jixie BPMA X position drift
370860 04/06/12 18:40 Jixie Status Update
370771 04/06/12 14:31 Jixie Beam slip the target cup but HRS can not tell
370753 04/06/12 13:33 Jixie Check raster size
370729 04/06/12 13:07 Jixie MCC start to give us beam
370723 04/06/12 11:40 Jixie Access the hall again to check FSD
370721 04/06/12 11:16 Jixie Go back to beam permit, continue moller measurement
370709 04/06/12 10:44 Jixie Target field quech, controlled acess
370457 04/05/12 17:31 Jixie Status Update
370442 04/05/12 16:07 Jixie Today's run plan
370427 04/05/12 15:33 Jixie target position changed after determine the center
370426 04/05/12 15:32 Jixie This is NH3 target
370425 04/05/12 15:22 Jixie Hall A harp issue
370427 04/05/12 15:33 Jixie target position changed after determine the center
370315 04/05/12 12:19 Jixie link to Harp check elog
370271 04/05/12 10:16 Jixie Harp trouble shooting start at 10:30
370426 04/05/12 15:32 Jixie This is NH3 target
370253 04/05/12 09:12 Jixie It will be better to have a reference in the same pad
370253 04/05/12 09:12 Jixie It will be better to have a reference in the same pad
370089 04/04/12 22:34 Jixie Zhang Status Update
369534 04/03/12 11:24 Jixie g2p|gep beam recovery procedure added into the howto page on wiki
369395 04/02/12 19:58 Jixie Changes to the run plan, a note for the shift leader
369359 04/02/12 18:20 Jixie Status update
368443 03/30/12 22:33 Jixie, Min, beam position dependence
368420 03/30/12 21:43 Jixie Spot_L 3506
368121 03/29/12 18:35 Jixie Right dipole ramping speed
368113 03/29/12 17:23 Jixie Zhang Tools to calculate septum current
367866 03/28/12 23:55 Jixie, Min, optics summary of 2.5T, 90deg target field and 2.254 GeV beam, 40-32-16 right septum
367864 03/28/12 23:35 Jixie Escort acess to move sieve out
367861 03/28/12 23:35 Jixie Finished optics
367857 03/28/12 23:25 Jixie Slow raster on, 1.4V
367852 03/28/12 23:13 Jixie Turn on faster raster 2x2
367850 03/28/12 23:11 Jixie Finish delta scan. Set both arms to H elastic (2.228)
367843 03/28/12 22:58 Jixie left delta to -1%
367841 03/28/12 22:56 Jixie Should be -3%, not 3%
367834 03/28/12 22:42 Jixie left delta =-2%
367827 03/28/12 22:27 Jixie left delta = 3%
367841 03/28/12 22:56 Jixie Should be -3%, not 3%
367816 03/28/12 21:50 Jixie Cycle Left Q2,Q3, set to delta=4%
367771 03/28/12 19:49 Jixie Move beam back to nominal (0,0)
367766 03/28/12 19:34 Jixie change beam position to (-4,0)
367761 03/28/12 19:21 Jixie Change beam position to (-4,-4)
367754 03/28/12 19:07 Jixie Change beam position to (0,-4)
367747 03/28/12 18:51 Jixie Change beam position to (0,4)
367746 03/28/12 18:46 Jixie Hall C change HWP
367726 03/28/12 18:16 Jixie Ramp septum to 725.4(left) and 806.6(right)
367724 03/28/12 18:14 Jixie beam is back, continue optics
367716 03/28/12 16:31 Jixie Ramp down septa to zero
367704 03/28/12 16:02 Jixie Change right septum to 810A
367695 03/28/12 15:46 Jixie Change right septum to 802.6
367690 03/28/12 15:34 Jixie change right septum to 790.5A
367680 03/28/12 15:19 JIXIE change right septum to 798.5
367645 03/28/12 14:20 Jixie Optics start, tools window snapshot
367642 03/28/12 14:15 Jixie Left septum is back
367630 03/28/12 13:50 Jixie septum tripped
367236 03/21/12 11:41 Jixie Zhang Survey results are available in g2p wiki
366489 03/14/12 16:12 Jixie Zhang Sieve is out
366480 03/14/12 15:40 Jixie Set both HRS to 2.228, septa are already ramped up
366362 03/14/12 06:30 jixie left septum tripped! please watch a strip chart!
366362 03/14/12 06:30 jixie left septum tripped! please watch a strip chart!
366341 03/14/12 05:35 Jixie It looks like cosmic rates. The beam might be tripped when taking snapshot.
366341 03/14/12 05:35 Jixie It looks like cosmic rates. The beam might be tripped when taking snapshot.
366110 03/13/12 03:09 mhuang/jixie Large negative VertexZ events
366079 03/13/12 02:24 Jixie scaler rates for 22227|3139
366056 03/13/12 00:43 Jixie, Pengj Harp scan start, faster raster off
366055 03/13/12 00:41 Jixie Right dipole is ready for 2.251 GeV
366053 03/13/12 00:28 Jixie Changed RHRS to delta=0% (2.251), keep LHRS unchanged
366047 03/12/12 23:03 Jixie Faster raster off
366046 03/12/12 22:07 jixie HallC changed HWP out
366043 03/12/12 21:37 Jixie, Sasha Prepared to take moller data
365386 03/10/12 09:28 Jixie Controlled access
365385 03/10/12 09:05 Jixie MCC took beam away
365384 03/10/12 09:05 Jixie Moved beam to (0,-4), Not settled
365374 03/10/12 08:23 Jixie Beam is back
365373 03/10/12 08:15 Jixie Beam is not available
365369 03/10/12 08:03 Jixie Move beam to (0,4)
365367 03/10/12 08:01 Jixie Hall C changed HWP
365354 03/10/12 07:36 Jixie Moved beam to (4,4)
365343 03/10/12 07:13 Jixie Moved beam to (-4,0)
365338 03/10/12 07:02 Jixie Hall C changed HWP
365333 03/10/12 06:46 Jixie Move beam to (4,0)
365323 03/10/12 06:14 Jixie Beam is at (0,0)
365319 03/10/12 06:09 Jixie optics restarted! Move beam to (0,0)
365318 03/10/12 06:02 Jixie Hall C change HWP
365317 03/10/12 06:02 Jixie Wrong momentum control for both arm from Swing shift
365290 03/10/12 04:58 jixie Hall C changed HWP
365285 03/10/12 04:51 Jixie Asked MCC to move beam to (-4,-4)
365275 03/10/12 04:23 Jixie (0,-6) is too low, moved beam to (0.-4)
365268 03/10/12 04:12 Jixie Move beam to (0,-12)
365260 03/10/12 03:54 Jixie Hall C change HWP
365259 03/10/12 03:52 Jixie Beam finally reached (0,6)
365255 03/10/12 03:32 Jixie Finished (0,0) data taking, move beam to (0,6)
365252 03/10/12 03:19 Jixie Start optics beam position scan
365245 03/10/12 03:08 Jixie Turn off the slow raster
365241 03/10/12 03:05 Jixie Slow raster on
365239 03/10/12 03:04 Jixie changed beam position
365233 03/10/12 02:54 Jixie Slow raster off
365232 03/10/12 02:54 Jixie Hall C change HWP
365222 03/10/12 02:39 Jixie Slow raser on, change BPMB x from -1.7 to -1.0
365215 03/10/12 02:26 Jixie Tools window
364866 03/09/12 00:22 jpchen/Jixie Swing shift summary
364852 03/08/12 23:40 Jixie, JP, J change left delta to 0% for target position test
364849 03/08/12 23:33 Jixie, JP, J Start taking data, right dipole not ready yet
364848 03/08/12 23:27 Jixie, JP Set left delta to -4% and right hrs delta to -3.5%
364846 03/08/12 23:08 Jixie,JP Start delta scan. Set delta to 1%,
364843 03/08/12 22:59 JP, Jixie Correct: Slow Raster is 500mv, BPM position are
364838 03/08/12 22:55 JP, Jixie Correct: Slow Raster is 500mv, BPM position are
364833 03/08/12 22:46 Jixie,JP Moved beam 1 mm up (MCC unit)
364838 03/08/12 22:55 JP, Jixie Correct: Slow Raster is 500mv, BPM position are
364843 03/08/12 22:59 JP, Jixie Correct: Slow Raster is 500mv, BPM position are
364824 03/08/12 22:24 Jixie, JP Turned slow raster on, 500mv
364814 03/08/12 22:06 JP, Jixie Started optics acceptance calibration
364800 03/08/12 21:35 Jixie Moved beam to (6,0)
364797 03/08/12 21:30 Jixie Title is wrong. it is (0,-4)
364781 03/08/12 20:55 JP, Jixie Move beam to (-6,0)
364771 03/08/12 20:39 Jixie, JP Change beam to (-4,-4)
364753 03/08/12 20:02 Jixie, JP Move beam to (0,-6)
364736 03/08/12 19:25 Jixie, JP Change beam to (0,-10)
364797 03/08/12 21:30 Jixie Title is wrong. it is (0,-4)
364728 03/08/12 18:54 Jixie, JP Beam position is at (0,6)
364724 03/08/12 18:49 Jixie, JP Move beam to (0,8), then change to (0,6)
364708 03/08/12 18:18 Jixie, JP Tools snapshot, beam position(0,4)
364701 03/08/12 18:08 Jixie Change beam 4mm vertical up
364661 03/08/12 16:01 mhuang/jixie Target field ON runs: sieve pattern & dp spectrum
364636 03/08/12 15:09 Jixie Start to take optics data
364554 03/08/12 09:05 Jixie Set septa currents to 725.4A
364552 03/08/12 08:39 Jixie, Chao Escorted acess to move sieve in
364289 03/07/12 14:55 Jixie Zhang Beam trajectory for 2.5T, 90 deg target field
364225 03/06/12 08:47 mhuang/jixie LHRS Q3 scale down optics study
364213 03/06/12 07:01 Jixie set LQ3 to 882.3A
364202 03/06/12 06:50 Jixie Start taking Helium data for optics, delta=0%
364137 03/06/12 05:54 Jixie Set left HRS delta=0%, P=2.251, SeptumI=725.4A
364135 03/06/12 05:35 Jixie Cycle Left Q2,Q3
364096 03/06/12 04:50 Jixie change septa: Ileft=718.1A, Iright=725.4A
364088 03/06/12 04:22 Jixie change both septa to -3%, 703.6A
364086 03/06/12 04:17 Jixie Change septum current back to 718.1(left) and 725.4(right)
364076 03/06/12 04:08 Jixie Change both septa to 653A
364061 03/06/12 03:55 Jixie Change septa currents to 688A
364049 03/06/12 03:40 Jixie Change both septa currents to 725.4A
364033 03/06/12 03:23 Jixie Change both septa to 762 (5%)
364003 03/06/12 02:30 Jixie Change septa currents to 800A
363840 03/05/12 19:35 mhuang/jixie Dp spectrum for carbon and CH2 runs (central hole only)
363678 03/04/12 16:12 Jixie, Chao straight through optics summary, part 4
363663 03/04/12 15:48 Jixie, Chao Set left HRS momentum to quasi-elastic peak, P=2.228,
363645 03/04/12 15:24 Jixie, Chao Fast raster on , 1x1 mm, 100nA on CH2 target
363638 03/04/12 14:39 Chao, Jixie, straight through optics run summary, part 3
363606 03/04/12 13:49 Chao, Jixie changed right delta to 3.5%, P=2.172
363601 03/04/12 13:43 Chao, Jixie Set left delat to 4%, P=2.161
363564 03/04/12 12:40 Jixie set left delta to 1%,right delta to 2%
363554 03/04/12 12:20 Jixie. Min, straight through optics run summary, part 2
363540 03/04/12 12:02 Jixie Turn fast raster on for acceptance calibration
363539 03/04/12 12:02 Jixie change left septum back to 725.4A.
363531 03/04/12 11:52 Jixie, Min, set left septum to 730.3A
363515 03/04/12 11:27 Jixie, Chao, right delta set to 0%
363507 03/04/12 11:04 Jixie, Min, left delta to 0%
363501 03/04/12 10:36 Jixie Zhang, straight through optics run summary, part 1
363497 03/04/12 10:26 Jixie, Min, change right delta to -2%, P=2.296, septum I=739.9A
363484 03/04/12 09:53 Jixie change left delta to -1%, P=2.274, septum I=732.7
363464 03/04/12 09:10 Jixie change left delta to -2%, right delta to -3.5%
363450 03/04/12 08:30 Jixie left delta=-3%, P=2.319
363438 03/04/12 08:19 Jixie Right Dipole is ready, delta =-4%
363428 03/04/12 07:55 Jixie delta =-4%, P=2.341
363424 03/04/12 07:37 Jixie Zhang, Cycle Q2,Q3, prepare to do delta scan
363417 03/04/12 07:29 Jixie Zhang change LHRS momentum to 2.246, RHRS momentum to 2.2435
363409 03/04/12 07:06 jixie zhang change left dipole by -0.2% and right dipole by -0.3%
363400 03/04/12 06:48 Jixie Zhang changed Q1 to +1%
363391 03/04/12 06:26 Jixie Zhang change both Q1 by -1%
363385 03/04/12 06:14 Jixie Zhang set both septa to 725.4A
363380 03/04/12 06:04 Jixie Zhang Set both septa to 730.7A
363375 03/04/12 05:48 Jixie Change septa to -0.5%
363362 03/04/12 05:28 Jixie Zhang Changed septum to -2%
363361 03/04/12 05:26 Jixie Zhang Lower septa current by 1%
363341 03/04/12 04:48 Jixie Zhang, Sieve slits are now IN
363317 03/04/12 03:37 Jixie Zhang Escorted access to move sieve in 20 minutes
363313 03/04/12 03:31 Jixie Zhang Hall A Tools snapshot
363312 03/04/12 03:29 Jixie zhang Start taking optics data
363255 03/04/12 01:44 Jixie Zhang Cycle Q2,Q3, change HRS momenta to 2.251
363248 03/04/12 01:26 Jixie Zhang Change septa current: Ileft=716.76 Iright=711.379
363241 03/04/12 01:13 Jixie Zhang Log every change, please
363248 03/04/12 01:26 Jixie Zhang Change septa current: Ileft=716.76 Iright=711.379
363040 03/03/12 13:59 Jixie Zhang HRS Mometum set to quasi-elastic peak 2.2267
363029 03/03/12 13:43 Jixie Zhang Another executable to calculate septa currents
362408 02/27/12 22:33 Jixie Zhang, G2p Septa field measurement
362406 02/27/12 21:49 Jixie Zhang G2p Target field measurement